KAMPALA - Road construction in Nakawa Division, Kampala, is facing a serious setback as wastewater overflowing from a construction site disrupts ongoing public road works. The issue came to light on Thursday when local leaders and engineers conducted an inspection of infrastructure projects in the suburbs.
Inspection Reveals Damage
During the inspection of roads along Kigobe Road, which connects Ntinda and Kyambogo, as well as Kalinabiri Road, the team discovered that some projects have been delayed because wastewater frequently washes away the crushed stones and gravel used to seal the roads. The wastewater, allegedly diverted by property owners, is undermining the quality and progress of the road works.
Authorities Issue Warning
The Nakawa Mayor, Ali Bukeni, popularly known as Nubian Li, accompanied by the town clerk Moses Ssempa, warned those diverting wastewater to rectify the problem immediately or face action from the authorities. The mayor's team emphasized that such misconduct will not be tolerated and urged property owners to manage their waste responsibly.
The inspection was part of efforts to monitor the progress of various infrastructure development projects in Kampala's suburbs. The local leaders expressed concern that the wastewater issue could lead to further delays and increased costs if not addressed promptly.
Call for Cooperation
Residents and property owners have been called upon to cooperate with the authorities to ensure that road works proceed without hindrance. The mayor's office has promised to take strict measures against those found responsible for diverting wastewater onto public roads.
The disruption highlights the challenges faced in maintaining and developing urban infrastructure, particularly when individual actions compromise public projects. The authorities are determined to resolve the issue swiftly to keep the road projects on track.